HOME         PROFILE  PROJECTS ENQUIRY
 
ROHINI LANDMARK

The Location

ROHINI LANDMARK is situated at Karur Bye Pass Road. It is at a walkable distance from the hub of Trichy Chatram Bus Stand. Hotels, Schools, Colleges, Shopping Complexes, Hospitals kept the Chatram Bus Stand busy. ROHINI LANDMARK is situated in a calm location near Chatram Bus Stand.

The Project

ROHINI LANDMARK will have 28 Nos. of Super Deluxe apartment in four floors above ground floor. Ground floor will proved covered carparking and two wheeler parking. First floor will have 4 apartments and remaining three floors will have 8 apartments in each floor.

The Group

Rohini Group a leader in flat promotion commenced its activities way back in 1987. It was at the time when the heritage town of Srirangam was just opening up for the concept of new life style in apartments. Rohini not only changed this skyline of the island town but also spread its wings across the river to Tiruchy as well.

The Experience

So far 53 Projects have been raised or in other words more than 1500 dwelling units. Covered area of 12.50 Lakh Sq.ft. constructed in all. Rohini Housing Developers (P) Ltd., is headed by Er. M.V.Maruthachalam with experience of over 3 decades in construction activity, one third of which were assignments handled abroad. He is assisted by Er. M. Anand another qualified Engineer in Civil and Structural Engineering that apart from Business Administration.

Approval Details

Building License No.141/2011 / Sri dated 02.06.2011 issued from The Commissioner, Tiruchirappalli Corproration.

Planning Permit No.2/2011 dated 18.01.2011 issued from Member Secretary, Tiruchirappalli Local Planning Authority.

Project Highlights

-> A Prime and Central location in Trichy.
-> Pest Control Treatment.
-> TORSTEEL Licensed reinforcements.
-> Ready Mix Concrete.
-> Stand by Generator for Lift, Common Lights.
-> Fully furnished with Wardrobe and Loft shutters.
-> Modular kitchen cabinets and shutters below platform.
-> Premium quality 2’ x 2’ Vitrified Tiles for flooring.
-> Intercom facility connecting flats and security.
-> Modular Plate Switches for the entire flat.
-> High quality CP Fittings and single lever mixer in the bath.
-> Covered Car Parking at extra cost.
-> Teak wood Main door and shutter, melamine polished.
-> Stainless Steel, Chimney, Hob and Granite platform in Kitchen.
-> Automatic Lift with V3F technology.
-> Light fixtures and ceiling fans for all the rooms.

Specifications

Structure :
RCwith brick panel walls fine plastered. All internal partitions and main outer walls are with first quality table moulded brick work.

Joinery :
Main door is of Teak wood frame with solid wooden door melamine polish. Others doors have seasoned sal frames with flush door shutters. Windows and ventilators are made of seasoned sal with glazed shutters.

Flooring :
2’ x 2’ Vitrified Tiles (premium quality) flooring for all the areas except toilet, kitchen and sitout. Non slip ceramic tiles for the bathrooms.

Finishes :
Acrylic washable emulsion paint on 2 coats of wall putty for the inner walls and enamel paint for doors and windows.

Kitchen :
Polished Granite Slab, granite sink in Kitchen. Glazed Design tiles 4’ high above platform.

Electrical :
Three Phase Supply withindependent Meters. Concealed wiring with Copper Cables for adequate light and socket points. Power Points for Water Heater, Fridge and Wet Rice Grinder and AC in master bedrooms.

Storage :
Wardrobe in Bed Rooms and Store in Kitchen with precast RCC slabs. Shutters for Bedroom Wardrobe and Lofts with MDF Boards. Modular Kitchen cabinets and shutters below platform. Water Supply : Separate water tanks for groundwater and Corporation water.

Payment Schedule

Initial Advance -Rs. 5,00,000/-
Balance Land Cost (Within one month) -20% of Total Cost
On Completion of Stilt Level Floor Roof -20% of Construction Cost
On completion of Ground Floor Roof -15% of Construction Cost
On completion of First Floor Roof -15% of Construction Cost
On completion of Second Floor Roof -15% of Construction Cost
On completion of Internal Plastering -15% of Construction Cost
On completion Outer Plastering and Flooring -10% of Construction Cost
On Completion of Handing over -10% of Construction Cost

Registration Charges, Sales Tax, Service Tax as applicable and Deposits will be extra.

 
 
©All rights reserved. Rohini Developers (P) Ltd. Web@harshainfotech