The Location
ROHINI LANDMARK
is situated at Karur Bye Pass Road. It is at a walkable
distance from the hub of Trichy Chatram Bus Stand. Hotels,
Schools, Colleges, Shopping Complexes, Hospitals kept the
Chatram Bus Stand busy. ROHINI LANDMARK is situated in a
calm location near Chatram Bus Stand.
The Project
ROHINI LANDMARK
will have 28 Nos. of Super Deluxe apartment in four floors
above ground floor. Ground floor will proved covered carparking
and two wheeler parking. First floor will have 4 apartments
and remaining three floors will have 8 apartments in each
floor.
The Group
Rohini Group a leader in flat promotion
commenced its activities way back in 1987. It was at the
time when the heritage town of Srirangam was just opening
up for the concept of new life style in apartments. Rohini
not only changed this skyline of the island town but also
spread its wings across the river to Tiruchy as well.
The Experience
So far 53 Projects have been raised or
in other words more than 1500 dwelling units. Covered area
of 12.50 Lakh Sq.ft. constructed in all. Rohini Housing
Developers (P) Ltd., is headed by Er. M.V.Maruthachalam
with experience of over 3 decades in construction activity,
one third of which were assignments handled abroad. He is
assisted by Er. M. Anand another qualified Engineer in Civil
and Structural Engineering that apart from Business Administration.
Approval
Details
Building License No.141/2011 / Sri dated
02.06.2011 issued from The Commissioner, Tiruchirappalli
Corproration.
Planning Permit No.2/2011 dated 18.01.2011 issued from Member
Secretary, Tiruchirappalli Local Planning Authority.
Project Highlights
-> A Prime and Central location
in Trichy.
-> Pest Control Treatment.
-> TORSTEEL Licensed reinforcements.
-> Ready Mix Concrete.
-> Stand by Generator for
Lift, Common Lights.
-> Fully furnished with
Wardrobe and Loft shutters.
-> Modular kitchen cabinets
and shutters below platform.
-> Premium quality 2’
x 2’ Vitrified Tiles for flooring.
-> Intercom facility connecting
flats and security.
-> Modular Plate Switches
for the entire flat.
-> High quality CP Fittings
and single lever mixer in the bath.
-> Covered Car Parking at
extra cost.
-> Teak wood Main door and
shutter, melamine polished.
-> Stainless Steel, Chimney,
Hob and Granite platform in Kitchen.
-> Automatic Lift with V3F
technology.
-> Light fixtures and ceiling
fans for all the rooms.
Specifications
Structure
:
RCwith brick panel walls fine plastered. All internal partitions
and main outer walls are with first quality table moulded
brick work.
Joinery :
Main door is of Teak wood frame with solid wooden door melamine
polish. Others doors have seasoned sal frames with flush
door shutters. Windows and ventilators are made of seasoned
sal with glazed shutters.
Flooring :
2’ x 2’ Vitrified Tiles (premium quality) flooring
for all the areas except toilet, kitchen and sitout. Non
slip ceramic tiles for the bathrooms.
Finishes :
Acrylic washable emulsion paint on 2 coats of wall putty
for the inner walls and enamel paint for doors and windows.
Kitchen :
Polished Granite Slab, granite sink in Kitchen. Glazed Design
tiles 4’ high above platform.
Electrical :
Three Phase Supply withindependent Meters. Concealed wiring
with Copper Cables for adequate light and socket points.
Power Points for Water Heater, Fridge and Wet Rice Grinder
and AC in master bedrooms.
Storage :
Wardrobe in Bed Rooms and Store in Kitchen with precast
RCC slabs. Shutters for Bedroom Wardrobe and Lofts with
MDF Boards. Modular Kitchen cabinets and shutters below
platform. Water Supply : Separate water tanks for groundwater
and Corporation water.
| Initial Advance |
-Rs. 5,00,000/- |
| Balance Land Cost (Within one month) |
-20% of Total Cost |
| On Completion of Stilt Level Floor
Roof |
-20% of Construction Cost |
| On completion of Ground Floor Roof
|
-15% of Construction Cost |
| On completion of First Floor Roof
|
-15% of Construction Cost |
| On completion of Second Floor Roof
|
-15% of Construction Cost |
| On completion of Internal Plastering
|
-15% of Construction Cost |
| On completion Outer Plastering and
Flooring |
-10% of Construction Cost |
| On Completion of Handing over |
-10% of Construction Cost |
Registration Charges, Sales Tax, Service Tax as applicable
and Deposits will be extra.
|