ROHINI CITY SQUARE consists of two blocks. One residential block
in the rear having 16 Nos. of 3 bed room deluxe apartments in
4 floors, 4 apartments in each floor. 16 Nos. reserved Car Parks
are provided in Stilt Floor. There will be a Children Play area
and garden space covering 1000 Sq.ft in the project for the comfort
of the residents. Commercial Block in the front will house ultra
modern showrooms, BPO’s and office for MNC’s.
Approval Details:
> Building License No. 12109/4/F1 dated 20.12.2007
from Tiruchirappalli Corporation.
> Planning Permit No. 86/2007 dated 30.11.2007 from Tiruchirappalli
Local Planning Authority.
......................................................................................................................
PROJECT
HIGHLIGHTS
-> A Prime and Central location in Tiruchy
-> Pest Control Treatment
-> TORSTEEL Licensed reinforcements
-> Ready Mix Concrete
-> Stand by Generator for Life & Common Lights
-> 2’ x 2’ Vitrified Tiles for flooring
-> Colour sanitary wares.
-> Intercom facility connecting flats and security
-> Modular Plate Switches for the entire flat
-> High quality CP Fitting and single lever mixer in the bath.
-> Covered Car Parking at extra cost
-> Free covered two wheeler Parking
-> Teak wood Main door and shutter, melamine polished
-> Granite Sink & platform in Kitchen
-> Automatic Lift with V3F technology
-> Shutters for Bedroom Wardrobes and Lofts
-> Light fixtures and ceiling fans for all the rooms
-> Common area – Just 10.5 % only
-> Children Play area & Garden space more than
1000 Sq.ft.
PAYMENT TERMS
| At the time of booking |
-Rs. 1,00,000/- |
At the time Land Registration
(Inclusive Advance)
|
-20% of Total Cost |
| On Completion of still Level Floor Roof |
-20% of Construction Cost |
| On Completion of Ground Floor Roof |
-15% of Construction Cost |
| On Completion of First Floor Roof |
-15% of Construction Cost |
| On Completion of Second Floor Roof |
-15% of Construction Cost |
| On Completion of Third Floor Roof |
-15% of Construction Cost |
| On Completion of Brickwork & Plastering |
-10% of Construction Cost |
| On Completion of Handing Over |
-10% of Construction Cost |