click here click here
HOME         PROFILE  PROJECTS ENQUIRY
 

Door No.10, Crawford Colony Main Road, Tiruchirappalli – 620 012.


The Location

Crawford colony is one of the best developed residential area in the Madurai Highway of Tiruchirappalli Corporation. ROHINI ORCHARDS is just 100 feet away from the Crawford Colony Bus Stand in Madurai Road. It is just 2 Kms. from Tiruchirappalli Junction and Central Bus Stand. Tiruchirappalli Airport is 6 Kms. away from the site. Crawford Colony is surrounded with a host of well established schools like Kalaimagal Matriculation Higher Secondary School, Little Flower Higher Secondary School, Santa Maria Montessory School, etc., shopping arcades, banks and super markets. There are number of Engineering, Dental, Arts & Science, Catering and Teacher Training colleges in the Madurai Highway, with in 10 Kms. from the site.

The Project

ROHINI ORCHARDS consists of 2 Blocks – Block “A” & “B”. Each block will have 32 Flats. Stilt floor will house 32 reserved car parks and two wheeler parking. Four floors above will accommodate 8 deluxe apartments in each floor. Every floor will have 4 Nos. 3-Bed apartments and 4 Nos. 2-Bed apartments. 3-Bedroom apartments will be in the range of 1388 to 1453 Sq.ft. and 2-Bed apartments - 967 to 1017 Sq.ft.

Approval Details:

Building License No. 75/2006 dated 06.11.2006 from Tiruchirappalli Corproration.
Planning Permit No. 49/2008 dated 17.09.2008 from Tiruchirappalli Local Planning Authority.

......................................................................................................................

PROJECT HIGHLIGHTS

Check the features. Count the benefits.

-> A Prime and Central location in Tiruchy.
-> Pest Control Treatment.
-> TORSTEEL Licensed reinforcements.
-> Ready Mix Concrete.
-> Stand by Generator for Lift & Common Lights.
-> 2’ x 2’ Vitrified Tiles for flooring.
-> Intercom facility connecting flats and security.
-> Modular Plate Switches for the entire flat.
-> High quality CP Fittings.
-> Covered Car Parking at extra cost.
-> Granite Sink & platform in Kitchen.
-> Automatic Lift with V3F technology.
-> Common area – just 10.5% only.
-> Children Play area & Garden space more than 3000 Sq.ft.
-> Senior citizens walking corridor around the apartment.
-> Extra Works included in the rate per Sq.ft.
-> Grill gate for the entrance door.
-> Grill enclosure for Sitout / Service.
-> Glazed tiles above kitchen platform upto lintol level.
-> Two way control for Light, Fan and 5 Amps. Socket on bedsite in Bed -1/2/3.
-> Telephone point in Bed-1/2/3.
-> Television point in Hall and one Bed.
-> Electrical provision for inverter.
-> Power Point for Electric chimney in Kitchen.
-> All the toilets with Water Feater and Exhaust Fan provision.

Payment Schedule

At the time of Booking -Rs. 1,00,000/-
Land Cost (within 30 days from the date of booking) -25% of Total Cost
On Completion of Stilt Level Floor Roof -20% of Construction Cost
On Completion of Ground Floor Roof -15% of Construction Cost
On Completion of First Floor Roof -15% of Construction Cost
On Completion of Second Floor Roof -15% of Construction Cost
On Completion of Third Floor Roof -15% of Construction Cost
On Completion of Brickwork & Plastering -15% of Construction Cost
On Completion of Handing Over -5% of Construction Cost

Registration Charges, Sales Tax, Service Tax as applicable and Deposits will be extra.

 
 
©All rights reserved. Rohini Developers (P) Ltd. Web@harshainfotech